Design-Assist

You are here:

Collaborating with design teams to provide construction expertise and technical support during the design phase to ensure project feasibility and efficiency.


 

BIM / VDC (Building Information Modeling / Virtual Design and Construction):

  • 3D Modeling: Creating detailed 3D models of the project for enhanced visualization and planning.
  • Clash Detection: Identifying and resolving conflicts between different systems (e.g., structural, mechanical) before construction begins.
  • Project Collaboration: Facilitating collaboration among all stakeholders using shared BIM platforms.

Scanning:

  • 3D Laser Scanning: Utilizing laser scanners to create precise 3D models of existing structures or sites.
  • Surveying: Conducting site surveys to inform design and construction planning.
  • Data Integration: Integrating scanned data into BIM models for enhanced accuracy.

As-Built Documentation:

  • Accurate Records: Providing precise documentation of the as-built conditions of a structure.
  • Project Updates: Continuously updating the documentation throughout the construction process.
  • Verification: Ensuring that the final as-built documentation reflects the true state of the completed project.

Data Integration:

  • Model Coordination: Integrating various data sources into a single cohesive model for comprehensive project analysis.
  • Data Validation: Ensuring the accuracy and consistency of integrated data.
  • Workflow Automation: Streamlining workflows by automating data integration processes.

Coordination:

  • Design Coordination: Ensuring seamless coordination between different design disciplines to avoid conflicts.
  • Meeting Facilitation: Organizing and leading coordination meetings to address design challenges and ensure alignment.
  • Issue Resolution: Identifying and resolving design coordination issues promptly.

Clash Detection:

  • Conflict Identification: Using BIM technology to identify conflicts between various building systems before construction.
  • Resolution Strategies: Developing and implementing strategies to resolve identified clashes.
  • Reporting: Providing detailed clash detection reports to stakeholders for informed decision-making.

Data Management:

  • BIM Data Management: Managing and updating BIM data throughout the project lifecycle.
  • Document Control: Ensuring proper control and management of project documents and data.
  • Information Security: Implementing measures to protect sensitive project data from unauthorized access.